Saturday, December 17, 2011

and the next stage of assembly begins, head studs onto case.

 Pistons ready to attached to rods,
 Pushing wrist pins in place.
 Pistons and cylinders in place, time to lower on the shiny new cylinder head
 Preparing the pushrod tubes
 Pushrod tubes in position, time to torque down the head
 Next stage Rockers!!
With push rod length and rocker geometry 'sorted' for me, it was time to fit the rockers, torque them down and adjust the valves.

No comments:

Post a Comment